Search
Now showing items 1-2 of 2
Development Of A Model For Estimation Of Buried Large Diameter Thin-walled Steel Pipe Deflection Due To External Loads
(Civil & Environmental Engineering, 2013-07-22)
Design of buried pipeline systems involves solution of geotechnical and structural problems in addition to the hydraulics and mechanical issues. Just like any buried structure, it is of utmost importance to understand how ...
Development Of A Preliminary Cost Estimation Method For Water Treatment Plants
(Civil & Environmental Engineering, 2010-07-19)
Reliable cost estimates for construction, and operation and maintenance (O&M) of water treatment plants are essential for their project planning and design. During the planning phases of the project, preliminary cost ...